Legacy-data recovery
Assess drawings, BOMs, spreadsheets, and knowledge; identify conflicts; establish a controlled connectivity baseline.

Digital engineering
The goal is not merely another drawing. It is connected, reviewable information that helps requirements, devices, connectivity, harness definition, outputs, variants, revisions, and evidence stay aligned.
A practical path
Software fit, licensing, migration, integrations, and outcomes are program-specific. A bounded pilot should prove value before expansion.
Assess drawings, BOMs, spreadsheets, and knowledge; identify conflicts; establish a controlled connectivity baseline.
Connect proposed changes to affected interfaces, wires, variants, outputs, evidence, and supplier information.
Define common architecture and controlled options rather than maintaining disconnected copies.
Connect design intent to engineering decisions, verification needs, and manufacturing deliverables.
Focused demonstration
The email draft asks for the information needed to shape a useful discussion.